Permit and build an ADU in your backyard

  1. Map your lot and existing structures
    1 hour 30 min

    A to-scale sketch of the lot that the rest of this phase measures against: property lines with dimensions, the house footprint, garages and sheds, and the four utility entry points. The setback math in the ordinance screen is only as good as these measurements, so date the sketch and keep the source records with it.